mon, 10-sep-2007, 18:59

finished dog yard

finished dog yard

Well, we’re still moving into our new house, but it finally feels like we’ve got more stuff in the new house than the old one. Last night was the first night spent sleeping in our bed in our new master bedroom instead of sleeping in the guest bedroom. The struggle started almost three weeks ago when we bought all the materials for the new dog yard. Fourty-three 4x4’s, 45 2x4’s for rails and the gate, and later a bunch more wood for the gate on the deck and a set of stairs from the deck into the yard. Not to mention 300 feet of six-foot, “no climb”, wrapped wire fencing and 30 yards of wood chips. My plan called for 4x4 posts sunk between two and five feet in the ground, with notches at the top of each post to accept 2x4 rails that run from post to post. Each 2x4 is also notched so the two 2x4’s fit together, and as a pair, fit into the 4x4 notch. A long lag bolt holds the two 2x4’s together, and attaches them to the 4x4. All that notching took several days after work. Starting on Monday August 26th, we started tearing out the old dog yard, moving the wood chips around the yard, digging holes with a post hole auger, sinking the posts and attaching rails, hanging the fencing and big gate doors, and building the deck gate and stairs. Along the way we also did some painting, and moving the bare minimum of stuff needed to actually start living in the new place (coffee supplies, dog and cat food, etc.). It took us eleven days to get the whole thing done. The first photo on the right (click on the photos to see a larger version) shows the completed dog yard from the deck. The yard connects the deck (and thus, the house) with a covered dog shed at the other end. The dog houses are all pretty far from the house, but it’s the flattest, highest ground, so it makes the most sense to locate them there. There’s a double-wide gate near the houses so we can pull in the pickup truck if needed, and so it’ll be easy to get the dogs ready for mushing. At the house end, there’s a gate to keep the dog entrance to the house (a sliding glass door, unfortunately) separate from the human entrance (the front door). A gallery of all the photos we took during this process is at: Building a dog yard

goldstream creek

goldstream creek

Finally on Labor Day, we were ready to move in. But the refrigerator we’d ordered was being delivered a day and a half early and instead of moving in, we had to wait several hours while they got their delivery truck towed out of our driveway. But since then, things have been going well. Yesterday we rented a moving truck and loaded almost all of our furniture, our freezers, and some other larger items that needed to stay dry for the trip over to our new house. There’s still a bunch of work to be done at the old house, and even more work unpacking and trying to figure out where everything will go, but progress is being made. In a few weeks I might even be able to bake a loaf of bread or read a book! I can’t wait to try some of the recipes and techniques from Peter Reinhart’s new book Whole Grain Breads: New Techniques, Extraordinary Flavor. Possibly even in a new propane-fueled oven.
tags: bread  creek  dog yard  house  moving 
Meta Photolog Archives